{"id":25461,"date":"2025-05-05T09:12:54","date_gmt":"2025-05-05T09:12:54","guid":{"rendered":"https:\/\/investinnavarra.com\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/"},"modified":"2025-05-05T09:43:31","modified_gmt":"2025-05-05T09:43:31","slug":"grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales","status":"publish","type":"post","link":"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/","title":{"rendered":"Grupo Enhol will allocate \u20ac86.7 million to repower four wind farms in Caparroso, Cabanillas, Fusti\u00f1ana, and the Bardenas Reales"},"content":{"rendered":"<h3 data-start=\"278\" data-end=\"560\">The project, declared to be of \u201cForal Interest\u201d by the Government of Navarre, will involve the installation of 17 new wind turbines using more modern and efficient technology, as well as the dismantling of 142 turbines that are nearing the end of their 24-year operational lifespan. Support for the Green Energy Industry is one of the six strategic priorities of Navarre\u2019s Smart Specialisation Strategy (S4), which includes actions such as extending the operational life of wind and solar farms through expansion, repowering, or sustainable decommissioning. Similarly, the 2021\u20132025 Industry Plan prioritises the development of renewable energy by encouraging the growth of a dedicated sector in the region, along with its digital and ecological transformation.<\/h3>\n<p class=\"\" data-start=\"1042\" data-end=\"1223\">The four repowering projects are expected to take 14 months to complete, requiring between 150 and 200 people during the construction phase, and 20 mobile staff members afterward.<\/p>\n<p class=\"\" data-start=\"1225\" data-end=\"1490\">During the installation phase of the new turbines, the workforce profile will consist of approximately 5% senior engineers, 15% technical engineers, 70% technicians such as assemblers, crane operators and electricians, and 10% from other professional backgrounds.<\/p>\n<p class=\"\" data-start=\"1492\" data-end=\"1721\">The expected lifespan of the new facilities is 30 years. During this time, 12 maintenance professionals will be required: four at each of the \u2018Caparroso\u2019 and \u2018La Bandera\u2019 wind farms, and two at both \u2018Serralta\u2019 and \u2018San Gregorio\u2019.<\/p>\n<p class=\"\" data-start=\"1723\" data-end=\"1743\"><strong data-start=\"1723\" data-end=\"1743\">Project details:<\/strong><\/p>\n<ul data-start=\"1745\" data-end=\"2581\">\n<li class=\"\" data-start=\"1745\" data-end=\"1938\">\n<p class=\"\" data-start=\"1747\" data-end=\"1938\"><strong data-start=\"1747\" data-end=\"1796\">Caparroso Wind Farm (E\u00f3lica Caparroso S.L.U.)<\/strong>: dismantling 42 turbines and installing 6 new turbines of 5.7 MW each (34.2 MW total), with 120-metre towers and 163-metre rotor diameters.<\/p>\n<\/li>\n<li class=\"\" data-start=\"1939\" data-end=\"2128\">\n<p class=\"\" data-start=\"1941\" data-end=\"2128\"><strong data-start=\"1941\" data-end=\"1990\">Serralta Wind Farm (E\u00f3lica Cabanillas S.L.U.)<\/strong>: dismantling 20 turbines and installing 2 new turbines of 7 MW each (14 MW total), with 118-metre towers and 163-metre rotor diameters.<\/p>\n<\/li>\n<li class=\"\" data-start=\"2129\" data-end=\"2327\">\n<p class=\"\" data-start=\"2131\" data-end=\"2327\"><strong data-start=\"2131\" data-end=\"2189\">San Gregorio Wind Farm (also E\u00f3lica Cabanillas S.L.U.)<\/strong>: dismantling 25 turbines and installing 3 new turbines of 5 MW each (15 MW total), with 120-metre towers and 155-metre rotor diameters.<\/p>\n<\/li>\n<li class=\"\" data-start=\"2328\" data-end=\"2581\">\n<p class=\"\" data-start=\"2330\" data-end=\"2581\"><strong data-start=\"2330\" data-end=\"2381\">La Bandera Wind Farm (E\u00f3lica La Bandera S.L.U.)<\/strong>, located across Fusti\u00f1ana, Cabanillas and Bardenas Reales: dismantling 43 turbines and installing 6 new turbines of 5.7 MW each (34.2 MW total), with 120-metre towers and 163-metre rotor diameters.<\/p>\n<\/li>\n<\/ul>\n<p class=\"\" data-start=\"2583\" data-end=\"3000\">These four repowering projects are supported by grants from the Institute for the Diversification and Saving of Energy (IDAE), under the investment aid programmes for wind farm repowering, technological and environmental upgrades of hydroelectric plants (up to 10 MW), and innovative recycling solutions for wind turbine blades (Circular Repowering Programmes), all funded by the <strong data-start=\"2963\" data-end=\"2985\">Next Generation EU<\/strong> recovery plan.<\/p>\n<p class=\"\" data-start=\"3007\" data-end=\"3279\"><strong data-start=\"3007\" data-end=\"3047\">NAVARRE\u2019S RENEWABLE ENERGY ECOSYSTEM<\/strong><br data-start=\"3047\" data-end=\"3050\" \/>Navarre is a pioneer and European benchmark in renewable energy production, with a long-standing commitment to industrial and technological innovation that has contributed to the development of new global wind energy standards.<\/p>\n<p class=\"\" data-start=\"3281\" data-end=\"3722\">The renewable energy sector is the third most important industry in the region, following the automotive and agri-food sectors. It includes a robust industrial network of more than 110 companies, representing 10% of industrial employment and generating \u20ac4.5 billion in revenue\u2014equivalent to 5% of the region\u2019s GDP. It is also Navarre\u2019s second largest exporting sector, especially in the manufacturing of wind turbines and their components.<\/p>\n<p class=\"\" data-start=\"3724\" data-end=\"4064\">The region&#8217;s dense industrial ecosystem covers all links in the value chain, including a major renewable energy operator (Acciona Energ\u00eda) and two leading OEMs (Siemens Gamesa and Nordex-Acciona Windpower), along with a strong network of SMEs specialising in high-value components such as blades, control systems, bearings, and gearboxes.\u00a0Anyone interested in learning more about Navarre\u2019s renewable ecosystem can do so <strong><a class=\"\" href=\"https:\/\/investinnavarra.com\/en\/renewable-energies\/\" target=\"_new\" rel=\"noopener\" data-start=\"4147\" data-end=\"4214\">at this link<\/a>.<\/strong><\/p>\n<p><strong>Source: <\/strong><a href=\"https:\/\/www.navarra.es\/es\/-\/nota-prensa\/declarada-de-interes-foral-una-inversion-de-86-7-millones-del-grupo-enhol-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales?pageBackId=363032&amp;back=true\"><strong>Navarra.es<\/strong><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The project, declared to be of \u201cForal Interest\u201d by the Government of Navarre, will involve the installation of 17 new wind turbines using more modern and efficient technology, as well as the dismantling of 142 turbines that are nearing the end of their 24-year operational lifespan. Support for the Green Energy Industry is one of [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":25459,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27],"tags":[],"class_list":["post-25461","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-renewable-energy"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Grupo Enhol will allocate \u20ac86.7 million to repower four wind farms<\/title>\n<meta name=\"description\" content=\"The project will involve the installation of 17 new wind turbines using more modern and efficient technology, as well as the dismantling of 142 turbines.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Grupo Enhol will allocate \u20ac86.7 million to repower four wind farms\" \/>\n<meta property=\"og:description\" content=\"The project will involve the installation of 17 new wind turbines using more modern and efficient technology, as well as the dismantling of 142 turbines.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/\" \/>\n<meta property=\"og:site_name\" content=\"Invest In Navarra\" \/>\n<meta property=\"article:published_time\" content=\"2025-05-05T09:12:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-05T09:43:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/investinnavarra.com\/wp-content\/uploads\/2025\/05\/molinos-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"jyuguero\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"jyuguero\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/\"},\"author\":{\"name\":\"jyuguero\",\"@id\":\"https:\/\/investinnavarra.com\/en\/#\/schema\/person\/caf93abf312fad66ad0aeb77042a08ef\"},\"headline\":\"Grupo Enhol will allocate \u20ac86.7 million to repower four wind farms in Caparroso, Cabanillas, Fusti\u00f1ana, and the Bardenas Reales\",\"datePublished\":\"2025-05-05T09:12:54+00:00\",\"dateModified\":\"2025-05-05T09:43:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/\"},\"wordCount\":572,\"publisher\":{\"@id\":\"https:\/\/investinnavarra.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/investinnavarra.com\/wp-content\/uploads\/2025\/05\/molinos-scaled.jpg\",\"articleSection\":[\"Renewable energy\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/\",\"url\":\"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/\",\"name\":\"Grupo Enhol will allocate \u20ac86.7 million to repower four wind farms\",\"isPartOf\":{\"@id\":\"https:\/\/investinnavarra.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/investinnavarra.com\/wp-content\/uploads\/2025\/05\/molinos-scaled.jpg\",\"datePublished\":\"2025-05-05T09:12:54+00:00\",\"dateModified\":\"2025-05-05T09:43:31+00:00\",\"description\":\"The project will involve the installation of 17 new wind turbines using more modern and efficient technology, as well as the dismantling of 142 turbines.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/#primaryimage\",\"url\":\"https:\/\/investinnavarra.com\/wp-content\/uploads\/2025\/05\/molinos-scaled.jpg\",\"contentUrl\":\"https:\/\/investinnavarra.com\/wp-content\/uploads\/2025\/05\/molinos-scaled.jpg\",\"width\":2560,\"height\":1440,\"caption\":\"Grupo Enhol\"},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/investinnavarra.com\/en\/#website\",\"url\":\"https:\/\/investinnavarra.com\/en\/\",\"name\":\"Invest In Navarra\",\"description\":\"Herramienta del Gobierno de Navarra para atraer nuevas inversiones a Navarra\",\"publisher\":{\"@id\":\"https:\/\/investinnavarra.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/investinnavarra.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/investinnavarra.com\/en\/#organization\",\"name\":\"Invest In Navarra\",\"url\":\"https:\/\/investinnavarra.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/investinnavarra.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/investinnavarra.com\/wp-content\/uploads\/2022\/05\/logo-invest-v1-b.png\",\"contentUrl\":\"https:\/\/investinnavarra.com\/wp-content\/uploads\/2022\/05\/logo-invest-v1-b.png\",\"width\":768,\"height\":277,\"caption\":\"Invest In Navarra\"},\"image\":{\"@id\":\"https:\/\/investinnavarra.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/investinnavarra.com\/en\/#\/schema\/person\/caf93abf312fad66ad0aeb77042a08ef\",\"name\":\"jyuguero\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/investinnavarra.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/bec022f537bc5c4a4fc04358e7a6da57256902c0ca8b5694162efa5e686de828?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/bec022f537bc5c4a4fc04358e7a6da57256902c0ca8b5694162efa5e686de828?s=96&d=mm&r=g\",\"caption\":\"jyuguero\"},\"url\":\"https:\/\/investinnavarra.com\/en\/author\/jyuguero\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Grupo Enhol will allocate \u20ac86.7 million to repower four wind farms","description":"The project will involve the installation of 17 new wind turbines using more modern and efficient technology, as well as the dismantling of 142 turbines.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/","og_locale":"en_US","og_type":"article","og_title":"Grupo Enhol will allocate \u20ac86.7 million to repower four wind farms","og_description":"The project will involve the installation of 17 new wind turbines using more modern and efficient technology, as well as the dismantling of 142 turbines.","og_url":"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/","og_site_name":"Invest In Navarra","article_published_time":"2025-05-05T09:12:54+00:00","article_modified_time":"2025-05-05T09:43:31+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/investinnavarra.com\/wp-content\/uploads\/2025\/05\/molinos-scaled.jpg","type":"image\/jpeg"}],"author":"jyuguero","twitter_card":"summary_large_image","twitter_misc":{"Written by":"jyuguero","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/#article","isPartOf":{"@id":"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/"},"author":{"name":"jyuguero","@id":"https:\/\/investinnavarra.com\/en\/#\/schema\/person\/caf93abf312fad66ad0aeb77042a08ef"},"headline":"Grupo Enhol will allocate \u20ac86.7 million to repower four wind farms in Caparroso, Cabanillas, Fusti\u00f1ana, and the Bardenas Reales","datePublished":"2025-05-05T09:12:54+00:00","dateModified":"2025-05-05T09:43:31+00:00","mainEntityOfPage":{"@id":"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/"},"wordCount":572,"publisher":{"@id":"https:\/\/investinnavarra.com\/en\/#organization"},"image":{"@id":"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/#primaryimage"},"thumbnailUrl":"https:\/\/investinnavarra.com\/wp-content\/uploads\/2025\/05\/molinos-scaled.jpg","articleSection":["Renewable energy"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/","url":"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/","name":"Grupo Enhol will allocate \u20ac86.7 million to repower four wind farms","isPartOf":{"@id":"https:\/\/investinnavarra.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/#primaryimage"},"image":{"@id":"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/#primaryimage"},"thumbnailUrl":"https:\/\/investinnavarra.com\/wp-content\/uploads\/2025\/05\/molinos-scaled.jpg","datePublished":"2025-05-05T09:12:54+00:00","dateModified":"2025-05-05T09:43:31+00:00","description":"The project will involve the installation of 17 new wind turbines using more modern and efficient technology, as well as the dismantling of 142 turbines.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/investinnavarra.com\/en\/grupo-enhol-destinara-867-millones-de-euros-para-repotenciar-cuatro-parques-eolicos-en-caparroso-cabanillas-fustinana-y-bardenas-reales\/#primaryimage","url":"https:\/\/investinnavarra.com\/wp-content\/uploads\/2025\/05\/molinos-scaled.jpg","contentUrl":"https:\/\/investinnavarra.com\/wp-content\/uploads\/2025\/05\/molinos-scaled.jpg","width":2560,"height":1440,"caption":"Grupo Enhol"},{"@type":"WebSite","@id":"https:\/\/investinnavarra.com\/en\/#website","url":"https:\/\/investinnavarra.com\/en\/","name":"Invest In Navarra","description":"Herramienta del Gobierno de Navarra para atraer nuevas inversiones a Navarra","publisher":{"@id":"https:\/\/investinnavarra.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/investinnavarra.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/investinnavarra.com\/en\/#organization","name":"Invest In Navarra","url":"https:\/\/investinnavarra.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/investinnavarra.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/investinnavarra.com\/wp-content\/uploads\/2022\/05\/logo-invest-v1-b.png","contentUrl":"https:\/\/investinnavarra.com\/wp-content\/uploads\/2022\/05\/logo-invest-v1-b.png","width":768,"height":277,"caption":"Invest In Navarra"},"image":{"@id":"https:\/\/investinnavarra.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/investinnavarra.com\/en\/#\/schema\/person\/caf93abf312fad66ad0aeb77042a08ef","name":"jyuguero","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/investinnavarra.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/bec022f537bc5c4a4fc04358e7a6da57256902c0ca8b5694162efa5e686de828?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/bec022f537bc5c4a4fc04358e7a6da57256902c0ca8b5694162efa5e686de828?s=96&d=mm&r=g","caption":"jyuguero"},"url":"https:\/\/investinnavarra.com\/en\/author\/jyuguero\/"}]}},"_links":{"self":[{"href":"https:\/\/investinnavarra.com\/en\/wp-json\/wp\/v2\/posts\/25461","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/investinnavarra.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/investinnavarra.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/investinnavarra.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/investinnavarra.com\/en\/wp-json\/wp\/v2\/comments?post=25461"}],"version-history":[{"count":3,"href":"https:\/\/investinnavarra.com\/en\/wp-json\/wp\/v2\/posts\/25461\/revisions"}],"predecessor-version":[{"id":25472,"href":"https:\/\/investinnavarra.com\/en\/wp-json\/wp\/v2\/posts\/25461\/revisions\/25472"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/investinnavarra.com\/en\/wp-json\/wp\/v2\/media\/25459"}],"wp:attachment":[{"href":"https:\/\/investinnavarra.com\/en\/wp-json\/wp\/v2\/media?parent=25461"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/investinnavarra.com\/en\/wp-json\/wp\/v2\/categories?post=25461"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/investinnavarra.com\/en\/wp-json\/wp\/v2\/tags?post=25461"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}